10 Questions to Ask Before Hiring a Contractor in Pune
The answers to these will tell you more about a contractor than any brochure. Ask them before you pay an advance, not after.

Choosing a contractor is the single decision that determines how the next year of your life goes. Here are the questions worth asking, and what a good answer sounds like.
1. Can I see the built-up area calculation?
Why it matters: the area is half the price. If plinth, parking and terrace percentages are not written down, the final bill can move considerably.
Good answer: a written breakdown, floor by floor, with the percentages stated.
2. What material rates have you considered?
Why it matters: "tiles included" means nothing without a rate. Rs. 35/sq.ft and Rs. 100/sq.ft are both "included".
Good answer: a table of rates considered for tiles, granite, plumbing fittings, railings and grills.
3. Which brands will you use?
Why it matters: steel, cement, waterproofing chemicals, pipes, wiring and CP fittings vary enormously in quality.
Good answer: brands named in writing, with "or equivalent" defined rather than left open.
4. What is not included?
Why it matters: exclusions are where the arguments happen.
Good answer: a clear list — compound wall, landscaping, facade work, water tank, utility connections, and so on. A contractor who says "everything is included" has not read their own quotation.
5. How is payment linked to work?
Why it matters: payments tied to dates rather than stages put the risk entirely on you.
Good answer: a stage-wise schedule — advance, after plinth, after each slab, after brickwork, after plaster, before painting, on handover.
6. How long will it take, and what happens if it slips?
Why it matters: every project slips a little. You want to know how much and why.
Good answer: a realistic duration in months from commencement, and an honest explanation of what causes delays — usually material decisions and monsoon.
7. Can I visit a site you are working on now?
Why it matters: finished photographs are easy. A live site shows you how they actually work — safety, storage, cleanliness, supervision.
Good answer: yes, and this week.
8. Can I speak to a client from two years ago?
Why it matters: anyone can produce a happy client at handover. The interesting question is what happened when something needed fixing afterwards.
Good answer: a name and number, without hesitation.
9. Who supervises day to day, and how often will they be there?
Why it matters: you are not buying a brand, you are buying a site engineer's attention.
Good answer: a named person, and a realistic answer about how many sites they run.
10. Do you have a GST registration?
Why it matters: it tells you the business is formally constituted, and it matters for your own records.
Good answer: a GSTIN on the quotation itself.
One more thing
Notice how many of these are answered simply by a properly written quotation. If a contractor hands you a single page with a rate and a total, you have learned something before you have asked a single question.
We are happy to answer all ten for our own work — ask us.
Frequently asked questions
What should I check before paying an advance to a contractor?
A written built-up area calculation, the material rates considered, the brands named for steel, cement, waterproofing, pipes, fittings and paint, and a stage-wise payment schedule tied to completed work rather than dates.
How should payments be structured during house construction?
By stage, not by date — typically an advance, then payments after plinth, after each RCC slab, after brickwork, after plaster, before painting, and on handover. This keeps payment tied to work you can see.
Should I ask to visit a contractor's ongoing site?
Yes. Finished photographs are easy to produce; a live site shows how a contractor actually works — supervision, material storage, safety and cleanliness. A contractor with nothing to hide will arrange it the same week.
Read next
A 1,000 sq.ft house costs about Rs. 15 lakh to build in Pune and PCMC, 1,500 sq.ft about Rs. 22 lakh and 2,000 sq.ft about Rs. 30 lakh at Basic specification. Full table, plus why built-up area is larger than you think.
House construction in Pimpri-Chinchwad costs Rs. 1,499 to Rs. 2,099 per sq.ft turnkey in 2026. What the rate covers, what changes site to site across PCMC, and what to check before you appoint anyone.
A G+1 bungalow in Pune typically takes 10 to 14 months from foundation to handover. Here is the month-by-month breakdown, what actually causes delays, and which of them are in your control.